<ul id="wcqya"></ul>
<strike id="wcqya"></strike>
  • <strike id="wcqya"></strike>
    Current Location: Home>>News>>Company News

    News

    Contact Us

    Yancheng Chongda Petrochemical Machinery Co., Ltd

    General Manager: 13770027868

    Manager Xu: 18921851996

    Phone: 0515-86570558

    Email: yccd@www.lvkeang.com

    Add: No. 99 Dacui Road, Lugou Town, Jianhu County, Jiangsu Province

    No. 88 Zhengda East Road, Lugou Town, Jianhu County, Jiangsu Province

    Web: www.www.lvkeang.com


    How to operate a Christmas tree

    2024/08/18
    67

    Christmas tree is a wellhead device used for extracting oil, such as self jetting wells and machine extraction wells. It is the main equipment for controlling and regulating oil and gas production at the top of oil and gas wells, mainly composed of three parts: casing head, tubing head, and production (gas) tree body.

    1、 Opening a well (self jetting well): 1. Ensure that the production system is complete and the process is smooth enough to accept the fluid after opening the well. 2. All valves on the Christmas tree are in the correct on/off state, controlling the oil nozzle (adjustable oil nozzle). 3. Check the oil pressure at the wellhead and the status of safety equipment.

    2、 Closing the well (self spraying well): 1. Close the oil nozzle. 2. Close the wing valve. 3. Close the ground safety valve if necessary. 4. Close the main valve if necessary.

    3、 In some underground operations, the operation steps of the Christmas tree valve are as follows:

    1. Close the well (oil nozzle, wing valve, wax removal valve, surface safety valve, and main valve) before entering the downhole tool.

    2. Open the Christmas tree cap, install the riser and blowout preventer, and then conduct a pressure test on the riser.

    3. Open the ground safety valve and lock it with a fused threaded cap. Test the reliability of locking the threaded cap in the open position.

    4. Lock the hydraulic control circuit of the downhole safety valve of the oil pipe and test its reliability.

    5. Open the main valve and then open the wax removal valve.

    6. Hang labels on the locking parts of the main valve, wax removal valve, and safety valve to prevent other personnel from tampering with the valves.

    7. Tools for underground operations.

    8. After the downhole operation tool is lifted onto the riser, close the main valve and wax cleaning valve.

    After depressurizing and removing the riser of the blowout preventer, install the Christmas tree cap,

    10. Remove the locking thread cap of the ground safety valve, open the hydraulic locking valve of the downhole safety valve of the oil pipe, and remove the attached label,

    11. Open the well for production according to the instructions.



    ?
    Contact Us
    Sales Hotline:137-7002-7868
  • Mail:

    yccd@www.lvkeang.com

  • Web:

    www.www.lvkeang.com

  • Add:

    No. 99 Dacui Road, Lugou Town, Jianhu County, Jiangsu Province / No. 88 Zhengda East Road, Lugou Town

  • WeChat

  • WeChat

  • 视频一区精品自拍| 呦交小u女国产精品视频| 亚洲国产精品毛片av不卡在线| 91精品国产免费入口| 亚洲精品无码久久久久| 狠狠综合视频精品播放| 精品久久洲久久久久护士免费| 亚洲av午夜福利精品一区| 亚洲精品亚洲人成在线观看下载 | 久久精品无码免费不卡| 嫩草影院在线观看精品视频| 自怕偷自怕亚洲精品| 亚洲国产精品成人精品无码区在线| 亚洲国产日韩综合久久精品| 无码人妻精品一区二区三区久久 | a级亚洲片精品久久久久久久| 国产成人精品高清免费| 国产精品亚洲AV三区| 精品国产鲁一鲁一区二区| 奇米影视7777久久精品| 国产国产精品人在线视| 9久久9久久精品| 九色精品视频在线观看| 一区二区精品在线观看| 国产精品亚洲片在线花蝴蝶 | 图片区精品综合自拍| 亚洲精品天堂在线观看| 亚洲mv国产精品mv日本mv| 少妇伦子伦精品无码STYLES| 久久99国产精品久久| 日产精品卡2卡三卡乱码网址| 亚洲精品无码久久久久APP | 国产精品1024香蕉在线观看 | 日韩中文字幕精品免费一区| 久久亚洲精品专区蓝色区| 91精品国产91久久| 97精品人人妻人人| 亚洲欧洲精品视频在线观看| 精品欧洲AV无码一区二区男男| 91精品久久国产青草| 91精品国产高清久久久久久 |